Environmental Restoration
Document Type
Article
Publication Date
1-15-2014
Sponsorship
Department of Energy (DOE) National Nuclear Security Administration
GovDoc ID
SAND 2014-0499 P
Abstract
This Work Plan describes the procedures and construction specifications for the installation of three multiport soil-vapor monitoring wells at the Mixed Waste Landfill (MWL) as required by the Long-Term monitoring and Maintenance Plan for the Mixed Waste Landfill.
Language (ISO)
English
Publisher
Sandia National Laboratories
Keywords
AOC, Area of Concern, CAMU, Comment, Corrective Action Management Unit, Hazardous and Mixed Waste Management, Maintenance, Monitoring, Mixed Waste Landfill, MWL, Solid Waste Management Units, SWMU, 16 pages
Recommended Citation
Sandia National Laboratories/NM. "MWL Work Plan Install 3 Monitoring Wells MWL-SV03 MWL-SV04 MWL-SV05 at the Mixed Waste Landfill January 2014." (2014). https://digitalrepository.unm.edu/snl_er/6