Branch Mathematics and Statistics Faculty and Staff Publications
Document Type
Article
Publication Date
7-2017
Abstract
The Critical Path Method (CPM) is one of several related techniques for planning and managing of complicated projects in real world applications. In many situations, the data obtained for decision makers are only approximate, which gives rise of neutrosophic critical path problem. In this paper, the proposed method has been made to find the critical path in network diagram, whose activity time uncertain. The vague parameters in the network are represented by triangular neutrosophic numbers, instead of crisp numbers. At the end of paper, two illustrative examples are provided to validate the proposed approach.
Publisher
IEEE
Publication Title
2017 IEEE International Conference on INnovations in Intelligent SysTems and Applications (INISTA), Gdynia Maritime University, Gdynia, Poland, 3-5 July 2017
First Page
403
Last Page
407
Language (ISO)
English
Keywords
Neutrosophic Sets, Project Management, CPM, Score and Accuracy Functions
Recommended Citation
Smarandache, Florentin; Mai Mohamed; Yongquan Zhou; and Mohamed Abdel-Baset. "A Critical Path Problem Using Triangular Neutrosophic Number." 2017 IEEE International Conference on INnovations in Intelligent SysTems and Applications (INISTA), Gdynia Maritime University, Gdynia, Poland, 3-5 July 2017 (2017): 403-407. https://digitalrepository.unm.edu/math_fsp/421
Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
Included in
Construction Engineering and Management Commons, Mathematics Commons, Operations Research, Systems Engineering and Industrial Engineering Commons, Other Physical Sciences and Mathematics Commons